Project Type
|
Description
|
Paper
Machine Refiner Installation
|
Engineering
design for the installation of a 700 HP double disk tickler refiner on the No. 3 Paper
Machine. |
Decker
Installation
|
Engineering
design for the installation of a fourth decker for deinked stock thickening. |
Phase II -
Recycle Plant Expansion
|
Provide
miscellaneous design services to assist in the upgrade and expansion of the recycle fiber
plant. |
Recovery
Boiler Drum Level Installation
|
Engineering,
design to install new Steam Drum level sensors and interlock to boiler trips |
Recovery
Boiler BLRBAC Upgrade
|
Electrical and
controls design, programming and construction support. |
Secondary
Fiber Plant Expansion
|
Provide
preliminary design and Class 10 appropriation grade estimate for doubling the capacity of
an existing Secondary Fiber Plant. |
Feedwater
System As-Built
|
Complete
as-built of the instrumentation and controls for the Mill Feedwater System. Project
included P&ID's, loops and SAMA diagrams. |
TRS
Monitor Installation
|
Engineering
and design services to complete the installation of two owner-furnished TRS sampling and
monitoring systems on their No. 5 Recovery Boiler and No. 4 Kiln. |
BLRBAC
Upgrade
|
Provide
evaluation and +10% estimate to bring the No. 3 and No. 5 Recovery Boilers up to
BLRBAC requirements for an appropriations grade request. |
Paper
Machine Condensate (Return) Flow System
|
Provide
preliminary design and Class 10 estimate for the installation of flow meters and recorders
on the No. 2 Paper Machine for an appropriations grade request. |
Waste Fuel
Boiler As-Built
|
Complete
as-built of the instrumentation and controls for the Waste Fuel Boiler. Project included
P&ID's, Loops and SAMA diagrams. |
Washer
Retrofit
|
Provide
process evaluation and Class 10 cost estimate for an appropriations grade request. |
Recovery
Boiler Black Liquor Door Interlocks
|
Provide design
and documentation for the installation of limit switches and operator interface for the
Black Liquor Oscillator gun doors on the No. 3 and No. 5 Recovery Boilers. |
Recovery
Boiler Rebuild (Post-Explosion)
|
Construction
support, design of new instrumentation and as-built of P&ID's and Loop diagrams. |
Paper
Machine Refiner Installation
|
Engineering
and design for the installation of a third refiner. |
Plant
Effluent Study
|
Study to
evaluate the effluent streams and develop projects to reduce effluent and close-up the
process. |
Steam Box
Hood Vacuum System Modification
|
Engineering
and design of the modifications to the existing paper machine vacuum hood to improve
moisture removal efficiency from the sheet. |
Chip and
Sawdust Silo Control and Power System Upgrade
|
New MCCs and
instrumentation for the upgrade of the chip and sawdust system from the chip pile to the
silo table feeders. |
Paper
Machine Rossilator Shower As-Built
|
As-built of
the existing rossilator shower. |
Paper
Machine Uhle Box Separator
|
Design of a
new Uhle Box Separation System including vessels and piping. |
Paper
Machine Drives Upgrade
|
Mechanical
design of new motor bases and drives for a new GE drive system. As-built of the existing
and design of new benchboards for the new drive systems. Complete shutdown construction
support and supervision. |
Water
System Conservation and Management System
|
Evaluation of
the existing water system and preliminary design of a new filtration system to reduce
turbidity and provide the mill with a completely flexible water source. Preliminary
layouts and Class 10 construction cost estimate for the new system. |
Power
Boiler Ash Handling System
|
Preliminary
design and construction Class 10 cost estimate for a new ash handling, conveying and
storage system. |
Paper
Machine Silent Drive Dryer Study
|
System
evaluation, preliminary design and construction cost estimate for the upgrade of the
existing PM to a silent drive system. |
Process
and Capacity Improvement Project
|
Capacity
upgrade of the existing facility from 80 TPD to 275 TPD. Included was a new pulper, tanks,
piping and mechanical design. |
Chlorine
Relief System Evaluation
|
As-built and
evaluation of the existing chlorine system for safety. |
Paper Mill
Restart
|
Detailed
engineering, design and construction management for a project to restart a paper mill
using market pulp. Included installation of a pulper, new refiners, stock blending
controls, PLC based control system, and a new hog fuel handling system. |
Deink Pulp
Mill Economic Feasibility
|
Study the
economic feasibility of constructing a 200 to 300 TPD deink pulp mill designed to produce
fine paper pulp from 100% post consumer waste. |
Hardwood
and Softwood Refiners
|
Preliminary
engineering, cost estimating, detailed design and construction management for the
installation of three double disk refiners. This project included online freeness
analyzers. |
Chlorine
Dioxide Chillers
|
Detailed
design and engineering for the installation of two chillers to provide chilled water for
the production of chlorine dioxide. |
Reliability Study
|
Identify and analyze the causes of reliability
problems in all areas of a 1740 TPD bleached kraft market pulp mill. |