The following is a selection of some of our steam & power industries projects we have worked on through the years.

Project Type

Description

Twin Boiler Installation Engineering for the specification and installation of two new 13,200 lb./hr package boilers for use in an asphalt refinery.
Specification for the No. 5 Circulating Fluid Bed Boiler Specifications for the procurement of a new 320,000 lb./hr 1500 psig/950° F fluid bed boiler. Limestone absorbers and limestone and ash handling systems were included as part of this specification.
Fluidized Bed Furnace Engineering and design for the retrofitting of an existing wood refuse fuel dryer with a fluidized bed furnace. The new furnace burns wood refuse on a fluidized bed style hearth to furnish hot flue gas to the adjacent rotary dryer. This installation was the first of its type.
Hog Fuel Dryer Engineering and design for the installation of a hog fuel dryer system. This dryer provided fuel with consistent size and moisture content.
Kraft Recovery Boiler and Evaporators Engineering and preliminary cost estimating for the installation of a new 3.85 MM lb./day recovery boiler and evaporator set.
Reliability Survey Completed a mill wide study of utility systems for reliability and energy management.
Bark Press Installation Detailed design, engineering and construction management for the installation of bark press.
Steam Demand and Supply Analysis Steam balances under different operating scenarios and times of year. Prediction of steam demand when new pulp mill was operational.
Boiler Model Boiler analysis and model of this large hog fuel boiler. Determination of the limiting factors to burning pulp mill waste solids. Prediction of air emissions.
Shop Assembled Boiler for District Heating Preliminary engineering, cost estimating and detailed design for the installation of a 100,000 lb./hr boiler.
Energy Study Study to determine the changes in steam balances, power usage, and internal power production due to transition to OCC pulping.
64 MW Turbine Generator Detailed design and engineering for the installation of a double automatic extraction condensing turbine including all auxiliary equipment.
45 MW Turbine Generator Detailed design and engineering for the installation of two double automatic extraction condensing turbines.
43 MW Turbine Generator Detailed design and engineering for the installation of a double automatic extraction condensing turbine.
5 MW Turbine Generator Detailed design, engineering and construction management for the installation of automatic extraction back pressure turbine. The turbine was purchased used and refurbished.
Bubbling Fluid Bed Retrofit Study Determine feasibility, scope, capital costs and operating savings resulting from replacement of a traveling grate with a bubbling fluid bed.
Circulating Fluid Bed Boilers Review vendor proposals and prepare a comparative evaluation of coal fired circulating fluid bed boilers.
Recovery Boiler Model Develop a complete model of three red liquor recovery boilers and common scrubber and stack. The model calculates combustion, steam generation and pressure drop through the air emissions equipment.
Kraft Recovery Boiler and Liquor Evaporators Detailed design and engineering for the installation of a 300 tpd black liquor recovery boiler, evaporators and concentrator.
Natural gas to No. 5 Boiler Engineering to add the capability to fire natural gas in addition to oil as a supplement the firing of hog fuel at the number 5 boiler. Interfaced with local PSAPCA for compliance documentation.
Class 10 Estimate, No. 3 and No. 5 BLRBAC Upgrade Provide evaluation and +10% estimate to bring the No. 3 and No. 5 Recovery Boilers up to BLRBAC requirements for an appropriations grade request.
No. 5 Recovery Boiler BLRBAC Upgrade Electrical and controls design, programming and construction support
Waste Fuel Boiler As-Built Complete as-built of the instrumentation and controls for the Waste Fuel Boiler. Project included P&ID's, Loops and SAMA diagrams.
No. 3 and No. 5 Recovery Boiler Black Liquor Door Interlocks Provide design and documentation for the installation of limit switches and operator interface for the Black Liquor Oscillator gun doors on the No. 3 and No. 5 Recovery Boilers.
No.4 Recovery Boiler Rebuild Construction support, design of new instrumentation and as-built of P&ID's and Loop diagrams.
No. 3 and No. 4 Recovery Boiler Drum Installation Engineering design to install new Steam Drum level sensors and interlock to boiler trips.
Soot Blower Piping Complete engineering, design, and stress analysis services to complete the steam supply piping for the installation on six additional soot blowers to Unit No. 1.
Power Boiler Improvement Study Fuel conversion of an existing gas fired 350,000 lb/hr, 1250 PSIG boiler, to burn hog fuel
Power Boiler Evaluation Evaluation of the existing power boiler to establish the maximum firing rates for the combustion of bark and sludge with minimum supplemental firing and consistent with permitted emission rates.
Boiler Plant Condition Survey Evaluation of the existing boilers to determine their service life and possible improvements. Included as part of this study was the evaluation of steam supply alternatives for the mill.
No. 2 Boiler Stack Engineering for the design and installation of a new boiler stack for the number 1 and 2 boilers.
Power Plant Condition Survey Survey of the operating and maintenance records to determine the condition of the power plant at this pulp and paper mill.
Power House Reliability Study Evaluate the electrical and steam supply operation of the power house to determine causes for electrical power disruptions.
Mill Steam Balance Complete mill steam balance in both tabular and visual form. The steam balance is used as a tool for powerhouse operations to better manage their resources.
Steam Distribution Piping Analyze steam distribution system and perform flexibility analysis. Review radiograph and lab analysis of failed welds.
Waste Heat Boiler for a 30MW Gas Turbine Engineering for the installation of a 250,000 lb./hr multi-pressure waste heat boiler and ductwork from a 30MW gas turbine generator.
Twin Gas Turbine Generators and Waste Heat Boilers Engineering and Owner Liaison services for the installation of two 25,000kW gas turbine generators and two 200,000 lb./hr waste heat boilers with economizers.
Wood Refuse Fired Boiler and Turbine Generator Preliminary engineering for the installation of a 200,000 lb./hr hog fuel boiler and 10MW double automatic extraction condensing turbine generator.
Cogeneration Study Study of three options for size and location of a combined cycle gas turbine cogeneration system.
Cogeneration Study Study to evaluate several proposed cogeneration alternatives.
Combined Cycle Scope and Cost Estimate Development of preliminary scope and cost estimate for a 60 MW cogeneration system using an ABB gas turbine.
Cogeneration Study Steam balance, preliminary scope and cost estimates for a number of cogeneration options to generate 25 MW.
Cogeneration Study Evaluated options for cogeneration including impact on power, steam, siting, emissions and cost.
Gas Turbine Analysis Develop capital cost estimate and complete a proforma for the installation of a gas turbine with heat recovery.
Mill Steam and Power Study Determine thermal match and sizing requirements for a combined cycle cogeneration facility.
Energy Audit Estimated project costs and calculated energy savings for installing high efficiency fan motor with variable speed drive, and for replacing lighting, ballasts, and curing oven heater SCR controls.
Energy Audit Estimated project costs and calculated energy savings for installing high efficiency motors with variable speed drives, and for replacing lighting, and ballasts.
Energy Audit Estimated project costs and calculated energy savings for installing high efficiency motors with variable speed drives, and for replacing lighting, and ballasts.