Project Type
|
Description
|
Stacker
Programming
|
Provide PLC
programming services for a veneer dryer / stacker |
Planer /
Trimmer Programming
|
Provide
programming services to reconfigure the operation of a PLC controlled planer / trimmer. |
Chiller
Installation and Office Building Utilities
|
Engineering,
design for relocated chiller controls and power. New office building utilities design. |
Maintenance
Software
|
Write software
for user-friendly storage and retrieval of maintenance information. Also provide
preventative maintenance software. |
Planer /
Trimmer Programming
|
Provide
programming services for PLC's on two planers. Complete programming of a 30' planer to
reduce shorts, and revisions to a 45' planer. |
| Load
Shedding and PT Scheme |
Design
of a 115kV and 230 kV load shedding and transfer system for a Northwest utility. |
| Liquid
Storage Warehouse |
Design
of a warehouse and shop area to store and transfer flammable and hazardous liquids. |
| Planner-Trimmer
Programming |
Design
changes and program changes to a stud mill planner-trimmer. Automation of formerly manual
operations. |
| Waste
Water Treatment System |
Design of a
wastewater treatment system for ammonia, chlorine and fabric softener wastes. Handled all
permitting for the facility, operations manual and training of personnel. |
| Hydraulics
System Design |
Design of
hydraulic systems for the Washington State Ferry passenger and auto loading decks. |
| Building
Expansion |
Engineering
design for the expansion of a bottling plant, including a new warehouse, offices, and
chlorine bottling facility. |
| Water
Treatment Plant Controls |
Controls
design and programming for a municipal drinking water treatment facility. |
| Tire
Burning Facility |
Engineering
design of tire handling and conveying system into a cement kiln. |
| Tank
Certification |
State DOE
certification of tank integrity and closure for a solvent reprocessing plant. |
| Shipping
Terminal Expansion |
Mechanical and
electrical design for the expansion of an ocean freight shipping terminal. |
| Glass
Plant Expansion |
Engineering
design for the capacity expansion of a tempered glass manufacturing facility. |
| Plant
Work Flow Analysis |
Plant layout
and work flow study for a blow molded plastics plant relocation. |
| Methanol
Bottling Line Study |
Process
evaluation for the feasibility of installation of a methanol bottling line. |
| Auger
Design |
Design of a
steam heated auger for a composite roofing products plant. |
| Paint
Plant Upgrade |
Engineering
design for process quality upgrades in a paint manufacturing plant. |
| Waste
Transfer Pump Stations |
Engineering
design for municipal waste transfer pump station upgrades. |
| Emergency Power Study |
Feasibility study for a portable emergency power
system for a series of stormwater pump stations. |